Skip to main content
SEAI Energy Grant

SEAI Solar Panel Grant 2026

Up to €1,800 towards solar panels, plus €600 for a home battery. Here is how the grant is worked out, what panels cost after it, and how long they take to pay back.

Short answer: SEAI pays €700 per kWp for the first 2kWp and €200 per kWp up to 4kWp, capped at €1,800, plus €600 for a home battery. You must own a home built and occupied before 2025, use an SEAI-registered installer, and get approval before work starts.

Check your home in 30 seconds ↓

Last verified November 2026 against the official source ↗.

What's changed (2)

We log changes to amounts, rules and deadlines from 2026 onwards, each with its source.

How much grant your system gets

System sizeRoughlyGrant
1kWp2–3 panels€700
2kWp4–5 panels€1,400
3kWp7 panels€1,600
4kWp or more9–10 panels€1,800 (the maximum)
Home batteryadded to the same application+€600

A bigger system doesn't get more than €1,800, but it can still make sense if you use a lot of electricity. Households getting certain social welfare payments can get an enhanced grant of up to €8,400 (€9,000 with a battery). Panel counts are approximate: they depend on each panel's wattage.

What it costs, and how long it takes to pay back

HomeTypical systemCost after the grantPayback
2-bed terrace3.5kWp (8 panels)about €5,900about 6 years
3-bed semi-D4.4kWp (10 panels)about €6,100about 5½ years
4-bed detached5.3kWp (12 panels)about €7,400about 5 years

These are published 2026 examples (Selectra, September 2026). Energia (July 2026) puts a typical household at €6,000 to €9,000 after the grant, paying back in 4 to 6 years. Your quotes will depend on your roof, the panels and whether you add a battery.

What makes payback faster

  • Using the power yourself. Every unit you use instead of buying from the grid saves the full retail price. Run the washing machine, dishwasher and immersion during the day.
  • 0% VAT. Solar panel supply and installation on homes is charged at 0% VAT.
  • Getting paid for the surplus. Under the Clean Export Guarantee your supplier pays you for electricity you send back to the grid (about 18.5c to 25c per unit in 2026). The first €400 a year is tax-free.
  • A battery or an EV. Storing daytime power for the evening raises how much you use yourself.

The €600 home battery grant

  • Flat €600 for a home battery of 5kWh or larger (new from 6 October 2026).
  • With or without new panels: claim it with the solar grant in one application, or on its own, including for a battery added to solar panels you already have.
  • Same home rule as solar: built and occupied before 2025, SEAI-registered installer, approval before work starts.
  • On a qualifying welfare payment? The enhanced grant covers solar and a battery together, up to €9,000 (it funds a battery of up to 5kWh).

Sources: grant data (checked monthly); solarinfo.ie, 3 October 2026 ("a battery of 5 kWh or larger; smaller batteries do not qualify"; claimable "on its own, including for a battery added to an existing solar PV system"); ess-news.com, 30 September 2026 (enhanced grants: "the maximum battery capacity funded will be 5 kWh"). Confirm on seai.ie before you buy.

Eligibility checklist

  • You own the home (owner-occupiers and landlords can apply)
  • The home has an MPRN and was built and occupied before 2025
  • The home has not had an SEAI solar PV grant before
  • An SEAI-registered solar installer does the work (find one in your county)
  • You wait for your grant offer before any work starts
  • A post-works BER is done after installation (your installer will arrange or advise)

Apartments can qualify too, usually through the owners' management company where there's a suitable roof.

How to apply, step by step

  1. Get two or three quotes from SEAI-registered installers. Ask what size suits your usage and roof.
  2. Apply online at seai.ie with your MPRN. Add the battery to the same application if you want one.
  3. Wait for the grant offer, then book the installation within the offer period.
  4. Install, and have the installer register the system with ESB Networks.
  5. Submit the completion documents (installer's declaration and post-works BER). SEAI pays the grant to you.
  6. Sign up for the Clean Export Guarantee with your electricity supplier so you're paid for exports.

Combine it with

On a qualifying social welfare payment? The free Warmer Homes scheme has offered solar PV and a battery as standard on eligible homes since October 2026.

Common reasons for rejection

  • Work started before approval, or the installer isn't SEAI-registered.
  • The home was built or first occupied in 2025 or later.
  • The home already had an SEAI solar grant.
  • Planning permission was needed but not obtained (protected structures, conservation areas).

Could your roof qualify for solar?

Pick your county, BER and build year. We'll fill those in for you, ask a few quick questions, then show the solar grant and every other grant your home may qualify for.

Solar panel grant: questions people ask

How much is the SEAI solar panel grant in 2026?

€700 per kWp for the first 2kWp and €200 per kWp from 2kWp to 4kWp, capped at €1,800. A 4kWp system (about 9 or 10 panels) gets the full €1,800. A home battery can add €600. Households on certain social welfare payments can get an enhanced grant of up to €8,400, or €9,000 with a battery.

How much do solar panels cost in Ireland after the grant?

Typically about €6,000 to €9,000 for an Irish home after the €1,800 grant. Published 2026 examples put a 4.4kWp system (10 panels) on a 3-bed semi at about €6,100 to €6,600 after the grant. Solar panel installation is charged at 0% VAT.

How long do solar panels take to pay back in Ireland?

Most published 2026 estimates are about 4 to 6 years. You save most by using the electricity yourself during the day; any surplus is paid for under the Clean Export Guarantee, and the first €400 a year of that income is tax-free.

Is my house too new for the solar grant?

The home must have been built and occupied before 2025. Homes built since then are expected to include renewable energy under the building regulations.

Can I get the solar grant if I rent my home out?

Yes. Owner-occupiers and landlords can apply. Tenants can't apply themselves, but can ask their landlord to.

Do I need planning permission for solar panels?

Most homes don't. Rooftop solar on a house is generally exempt from planning permission, but protected structures and homes in architectural conservation areas may still need it. Check with your council if you're unsure.

Can I start the installation before SEAI approves the grant?

No. Apply online, wait for your grant offer, and only then let an SEAI-registered installer start. Works started before approval are not paid.

Can I get the €600 battery grant if I already have solar panels?

Yes. The battery grant can be claimed on its own, including for a battery added to an existing solar PV system, or together with the solar grant in one application. The home must have been built and occupied before 2025, the battery must be 5kWh or larger, and you use an SEAI-registered installer with approval before work starts.

What size battery qualifies for the SEAI grant?

A home battery of 5kWh or larger. Smaller batteries don't qualify. The grant is a flat €600 whatever the size above that, so a bigger battery doesn't get more grant.

Sources: SEAI solar electricity grant page; cost and payback examples from Selectra (updated 12 September 2026) and Energia (13 July 2026). Always confirm current amounts on seai.ie before you apply.

← Back to all grants